ÇALKUYUCAK AKKENT HEPP
Akkent-Çalkuyucak HEPP, located on the Büyük Menderes River within the borders of Çal district of Denizli province, was completed and put into operation on 22.11.2013.As project structures; The regulator is designed as a 4 km tunnel, a loading pool, a penstock with a diameter of 1.5 meters with a drop of 89 meters, and has a water usage potential of 18 m3 / second. All of the reinforced concrete productions have been made within the scope of the project.
READ MORE
KUMKÖY HYDROELECTRIC POWER
With in the scope of the project located on the Yeşilırmak River in Çarşamba District of Samsun Province: Regulator Structure, Power Plant building, 15 km irrigation main canal, 142 km secondary irrigation canal, reinforced concrete construction of 2900 art structures all of their productions have been done.
READ MORE
ÇARŞAMBA PLAIN
2 M UNDER CODE WITH RIGHT COAST SURFACE DRAINAGE REPLACEMENT PUMPED DRAINAGE OF THE LAND CONSTRUCTION
Construction of a drainage network in order to drain the 29,100 ha area.Opening of main drainage channel, backup drainage channel and tertiary drainage channels, construction of stone fortified embankments within the scope of the mprovement of Terme Stream. Construction of all art structures belonging to channels (Bridge, Culvert, Crossroad, transformer buildings reinforced concrete fabrications, etc.)
EBRU HEPP
All of the power plant, regulator structures and other water intake structures were manufactured in the construction of the hull built on Elmalık and Keşlik brooks in Kastamonu province, Bozkurt district.
READ MORE
DAM AND HYDROELECTRIC POWER
Erzincan province, Ilic district, Bağıştaş dam and hull construction, water intake structure, 900 m long fish passage and additional productions reinforced concrete works were made.
READ MORE
Bridge Connection Roads Art Structures
3. Bridge north marmara motorway Göktürk room place junction connection roads, 4 upper passages, 3 lower passages, 12 culverts and some art structures have been manufactured.
READ MORE
BED STATE HOSPITAL
In the 250-bed hospital; 65 double bed rooms, 95 single patient rooms, 15 suite patient rooms, 4 infected patient rooms, 2 polyclinics, 50 examination rooms, 8 operating rooms, 3 general intensive care rooms, 3 surgical intensive There is a nursing room, 1 neonatal intensive care room and 2 dialysis rooms.
READ MORE
SCHOOL CONSTRUCTIONS
Our school constructions and educational complexes are under construction.
READ MORE
Housing and Other Residential Constructions
800 housing units in various regions of Turkey, villas, summer houses have been built.
READ MORE
COMMERCIAL BUILDINGS
8 factory building in various regions of Turkey, 5 job center (plaza), 5 industrial block, concrete plants, Construction site installations campuses ...
READ MORE
OVERSEAS PROJECTS
Fine and rough works of the 2,556-unit Al Ra'idah housing complex project in Jeddah, Kingdom of Saudi Arabia ...
READ MORE
BUSINESS CENTER CONSTRUCTION
The construction of the business center consisting of 12 independent sections and 2 workplaces was started in 2020 and the resettlement of the project was taken in 2021.
READ MORE